WE Report

Lessons Learned

Lesson Learned





By: Lars Solvang

Report No.

2191

Discipline/Origin

Subsea
Own Experience

Well

Oselvar
A-1 H, A-2 H, A-3 HT2

Date created

2021/10/01
1529 days ago

Project Phase

Operational
Project Phase

LL Type/Classification

Equipment
Negative

Borgland Dolphin


What happened in P&A:
Pulled landing string and run a tubing hanger running tool on drill pipe. Pull the completion with the drill pipe landing string.

What Was Planned

The plan was to pull the completion with the landing string.

What Was Learned

The clearance between the subsea test tree and the BOP are small and it will take time to rig down surface flow tree where the subsea test tree and the tubing will be hanging in slip moving up and down in the BOP. It is likely that this could damage both the BOP and the subsea test tree.

What Actions Are Required

Plan for running the tubing hanger running tool on drill pipe for pulling the completion.